Does anyone have some local knowledge of the A465 Heads of the Valleys roadworks? I plan to use this route for our next tour.
Traffic Wales is very informative and indicates when planned works and closures are due take place until. Some alerts say closures until 13th April, but others say until 19th. So not entirely clear, but a massive road building task I know so there maybe closures going on after the 19th maybe?
We will be going from Ross-on-Wye (M50/A40) then along the A465 towards The Gower on or after 22nd and want to take in this spectacular route so long as long delays don't spoil it.
Does the section near to Gilwern, where the current closures are, have a parallel diversion or should I be prepared to go around via Blaenavon then back to the A465 at Brynmawr?
Many thanks - diolch yn fawr
Traffic Wales is very informative and indicates when planned works and closures are due take place until. Some alerts say closures until 13th April, but others say until 19th. So not entirely clear, but a massive road building task I know so there maybe closures going on after the 19th maybe?
We will be going from Ross-on-Wye (M50/A40) then along the A465 towards The Gower on or after 22nd and want to take in this spectacular route so long as long delays don't spoil it.
Does the section near to Gilwern, where the current closures are, have a parallel diversion or should I be prepared to go around via Blaenavon then back to the A465 at Brynmawr?