I
iwjenkins
- Messages
- 21
- Vehicle
- T5 SE 180 4Motion
Hi...our Cali is on order and we are receiving e-mails stating the progress with the last as "status 10 with a build week of 22 - 25/05/2015"
In your experience how long after this date will the Cali be delivered? The supplier says that they take a week to build but I wanted to hear it from those that had experienced the whole process as to when it will arrive. Here are the status codes below; seems a long way to go from status 10; we don't want to miss the Spring/Summer.
Your advice would be welcome. thanks
Ian
Status codes
00 = Assigned to factory order no production week scheduled
10 = Factory ordered with production week scheduled
20 = Factory ordered production week confirmed
30 = In transit from factory
36 = Vehicle in port of exit – not released
38 = Vehicle in port of exit – released to shipping
39 = Vehicle on ship
40 = Vehicle arrival at UK port
60 = Dispatched to Southern Motor Group
70 = Vehicle arrived at Southern Motor Group
In your experience how long after this date will the Cali be delivered? The supplier says that they take a week to build but I wanted to hear it from those that had experienced the whole process as to when it will arrive. Here are the status codes below; seems a long way to go from status 10; we don't want to miss the Spring/Summer.
Your advice would be welcome. thanks
Ian
Status codes
00 = Assigned to factory order no production week scheduled
10 = Factory ordered with production week scheduled
20 = Factory ordered production week confirmed
30 = In transit from factory
36 = Vehicle in port of exit – not released
38 = Vehicle in port of exit – released to shipping
39 = Vehicle on ship
40 = Vehicle arrival at UK port
60 = Dispatched to Southern Motor Group
70 = Vehicle arrived at Southern Motor Group