Amarillo
Tom
Super Poster
VIP Member
For the past year and a bit the section in Deptford has been block by roadworks almost constantly
The section between Surrey Quays and Greenwich has only been open ~6 weeks. There was a long delay opening it because of works on the lifting bridge on Creek Road.
There are now three parallel cycle routes from Central London to Greenwich.
1. NCR 4 (Fishguard to Greenwich): through London it follows the meandering course of The Thames.
2. Cycleway 4: a fully segregated fast and direct cycle track alongside main roads
3. Quietway 1 (now rebranded Cycleway 10): using back streets, paths, parks and traffic calmed roads from Waterloo to Greenwich.
No wonder that cycle rates are surging in London.