bangorlad
VIP Member
Just been starting to install a single solar panel with curly lead from Roger + Solar Camper Solutions and have managed to get the lead through the slitted grommet into the cupboard before calling it a night and having a beer. It looks from a photo that I should feed the lead through the grommet more or less right up to the start of the curly bit, am I right? I decided not to put the panel on the roof this afternoon as I'm not comfortable I know enough about an open circuit panel sat for a few hours in bright sun so am working from the bottom up - should be solar by tomorrow...
Stew
Stew