Hi all, so as I'm now in a happy place after collecting my Cali at the weekend, and as promised I wanted to share a timeline of my order to give those still awaiting delivery some hope:
26/10/20 ordered van (suggested April/May delivery)
09/02/21 given build month of April by SMG
05/04/21 went into build (suggested 2 week turn around)
01/05/21 finished build and arrived at Emden (poss 2 weeks late due shutdown at VW)
10/05/21 On Ship
11/05/21 arrived at Sheerness
19/05/21 left port for dealer
22/05/21 collected from dealer
Its been a long 7 months but worth it in so many ways, weekends have been missing something not having a camper to get away in, and we've got it just in time for the sites opening, and have 2 booked up for the half term week so can't wait.
Now the fun starts, I asked SMG not to wash it as wanted to prep the paint myself for the first time, Matt at SMG really struggled handing me a dirty new Cali but told him it made me much happier!
Rest of the week booked off to now make it my own and fit all the parts I've been buying since October, the obvious Brandup items plus dashcam, new wheels, coilovers, spoiler, gloss grills, side bars, ABT splitter if it arrives, chrome side repeaters plus I'm sure lots I've forgotten about!
I know many will be haters for the mods but for me personally its about making it my own, one of the main things is the ride is way to soft for my liking, I'm used to fast roads cars so I need to sort that out and should be all sorted by the end of the week.
Thanks to all that have contributed to this thread as its been a great help to a new Cali owner going through the new order process for the first time.
You never know we may meet on a site one day, if you see a white Cali with big wheels and a short bloke with a huge smile, pop over and say hi!