Ch1pbutty
Super Poster
VIP Member
@Roger Donoghue
I am just about to order 2 panels for 2012 Beach.
- What is your current lead time for supply?
- How easy is it to also allow also charging of the main battery. Does it need a new wire running to the main battery, or, do you connect to an existing one under the passenger seat.
Many thanks
I am just about to order 2 panels for 2012 Beach.
- What is your current lead time for supply?
- How easy is it to also allow also charging of the main battery. Does it need a new wire running to the main battery, or, do you connect to an existing one under the passenger seat.
Many thanks
Last edited: